concurrent train simulation in java | concurrent train simulation in java project free download | concurrent train simulation in java from ss infotech | concurrent train simulation using java application | train simulation using java
Abstract:
This powerful windows JAVA
application is mainly aimed to serve the looping railways by which we could
able to demonstrate the moving
simulation of trains, number of trains & speed control time gap are those
adjustable functions and highlight to this application.
The application demonstrates a
concurrent train simulation in a
2-way direction train movement on the same
track. In this application Trains
are added with a origin station at the beginning of the route cycle with a time
lap of between 3 to 6 seconds. When the trains currently on map simulation (or)
maximum number of trains what we specified is not available on map (or) no more
trains are in movement then trains can move to both directions. When a train
leaves from the origin station it is locking the both options like: Path and
the platform at the next immediate station, the check goes like this firstly if
the path found free , then if there is any free platform at the next station.
If both platform are free then its choosing the one that have same direction
trains on it. If no train is in both platform then platform 0 its chosen by
default. If others trains coming, then the train waits until all others can
pass by. If the trains is an express then the train is not stopping at the
stations. When an express train exits a station is locking the next 2 stations
so it can move faster than the other trains. This however will be done, after a
time of 150 sec, so we ensure we will not have a colision between express and
new trains on map.
1.2 Existing System with Limitations
1) The Project Supports Single Track Line.
2) When Train Departure From the station
all the
Details
are sending to the next station, by manually.
1.3
Proposed System with Features
The implementation of the proposed system is java application based system.
This automated system allows the users to access information from various
devices.
This control program for the trains that lets them
travel between two stations safely.
Advantages:
1.
We Can Avoid
Collision between the two trains.
2.
Trains run in a
synchronize manner.
3.
Trains must be
“independent”. Each train is controlled by separate thread.
thank you for your comment
pls call me on 8125424511